Astrology infrastructure

Digest-bound guide

Calendar Conversion sensitivity workflow

How does uncertainty in calendar conversion change deterministic outputs?

A deterministic sensitivity workflow for Calendar Conversion, separating reproducible celestial computation from interpretive and predictive claims.

Bounded answer

Recompute the output across an explicitly bounded change in calendar conversion, preserve all other inputs, and report both the numerical delta and every categorical boundary crossing.

Input contract

What must be fixed first

Baseline canonical input manifest

One explicitly varied input or convention

Frozen kernel and dependencies

Numerical and categorical comparison thresholds

Procedure

Work the decision in order

  1. 1

    Freeze the baseline manifest and kernel.

  2. 2

    Define the variation before seeing the preferred interpretation.

  3. 3

    Recompute every point under the same operation.

  4. 4

    Measure numerical deltas and boundary crossings.

  5. 5

    Withhold outputs that are unstable across the admitted interval.

Expected outputs

  • Sensitivity table
  • Stable and unstable output sets
  • Boundary-crossing and refusal report

Refuse when

  • A date copied across calendars without a declared conversion can shift the instant by days.
  • Required input, unit, convention, or dependency version is absent.
  • An interpretive preference selects the computational convention after outputs are seen.

Questions this guide answers

How does uncertainty in calendar conversion change deterministic outputs?

Vary calendar conversion inside a declared interval while holding every other input and the kernel fixed.

Which information must be versioned?

At minimum, preserve source calendar, date fields, conversion convention, reform boundary, and resulting continuous day count, together with the canonical input and output digests.

When should an output be withheld?

Withhold it when a date copied across calendars without a declared conversion can shift the instant by days. or when a required dependency cannot be identified.

Does determinism validate the interpretation?

No. Determinism makes the computation reproducible; interpretive or predictive validity requires a separate prospective evaluation.

What belongs in the receipt?

The operation, canonical inputs, units, assumptions, dependency versions, outputs, uncertainty treatment, and package digest.

Limits

  • A date copied across calendars without a declared conversion can shift the instant by days.
  • Reproducible astronomical arithmetic does not validate an astrological interpretation or prediction.
  • No missing number, uncertainty interval, or calculation receipt is invented.